Verify Power Activation Sequence
Verify Power Activation Sequence
TC-INTRO-007
Description
Validates that the hanging power button activates power to the terminals with proper animation and visual feedback.
Test Objective
Ensure power activation mechanic functions correctly and provides clear visual and audio feedback.
Priority
Critical
Type
Functional
Author
Dominic Brooks
Est. Time
3 minutes
Preconditions
- Player has entered the ship via ladder
- Ship room is dark
- Door button is disabled
- Terminals are powered off
Test Steps
1
Action
Locate the hanging button in front of the terminals
Expected Result
Hanging button is visible and appears interactable
2
Action
Click the hanging power button
Expected Result
Button begins raising animation with sound effect
3
Action
Observe the button animation
Expected Result
Button raises slowly and smoothly
4
Action
Observe the terminal activation
Expected Result
Terminal lights turn on
5
Action
Wait for terminal boot sequence
Expected Result
Loading bar appears on the terminal and completes
6
Action
Check terminal interactability
Expected Result
Two terminals become interactable after power activation
Postconditions
- Power is activated
- Terminals are operational
- Player can interact with middle terminal
Tags
#intro
#power
#activation
#terminals
#functional
#critical-priority